2018 Projects
VARIOUS INFRASTRUCTURE LOCAL PROGRAM CY – 2018
-
• IMPROVEMENT OF DPWH-RIZAL 1 DISTRICT ENGINEERING OFFICE,GOVERNMENT CENTER,BRGY.CALUMPANG,BINANGONAN RIZAL - FEBRUARY 6, 2018 TO AUGUST 4, 2018
• REHABILITATION OF OPEN COURT TO A COVERED COURT BRGY. STA.ANA,TAYTAY RIZAL - APRIL 9, 2018 TO JULY 7, 2018
• REHABILITATION OF MULTI-PURPOSE COVERED COURT,BRGY.MAHABANG PARANG,ANGONO RIZAL - FEBRUARY 26, 2018 TO APRIL 26, 2018
• REHABILITATION OF COVERED COURT,JASENVILLE SUBDIVISION,BRGY. STA.JUAN CAINTA RIZAL - FEBRUARY 26, 2018 TO APRIL 26, 2018
• CONSTRUCTION AND REHABILITATION OF THE DRAINAGE OF MONTEVISTA PARK SUBDIVISION,BRGY.SAN ISIDRO,CAINTA RIZAL - FEBRUARY 26, 2018 TO MAY 26, 2018
• CONSTRUCTION OF DRAINAGE,SITIO VICTORIA TO CAINTA RIVER,CAINTA RIZAL - FEBRUARY 6, 2018 TO JUNE 6, 2018
• CONSTRUCTION OF THE BROOK,PUROK,BRGY.RAYAP,BINANGONAN RIZAL - APRIL 9, 2018 TO AUGUST 19, 2018
• CONSTRUCTION OF DIKE (RIVER WALL),BRGY.BOMBONG,BINANGONAN RIZAL - MARCH 1, 2018 TO JULY 28, 2018
• CONSTRUCTION OF SLOPE PROTECTION,VICENTE MADRIGAL NATIONAL HIGH SCHOOL,PANTOK,BINANGONAN RIZAL - FEBRUARY 28, 2018 TO JULY 27, 2018
• REHABILITATION/RIPRAPPING OF CREEK,BRGY.KINAGATAN,BINANGONAN RIZAL - MARCH 1, 2018 TO AUGUST 27, 2018
• CONCRETING OF ROAD INCLUDING DRAINAGE,FY MANALO BRGY.SAN ISIDR,CAINTA RIZAL - N/A
• CONSTRUCTION/REHABILITATION OF ROAD BRGY.HABAGATAN,BINANGONAN RIZAL - APRIL 9, 2018 TO SEPTEMBER 5, 2018
• CONSTRUCTION OF ROAD CONNECTING BRGY.ITHAN AND BRGY.KALINAWAN,BINANGONAN RIZAL - JULY 31, 2018 TO DECEMBER 27, 2018
• CONSTRUCTION OF ROAD INCLUDING DRAINAGE SYSTEM,BRGY.SAN JUAN,CAINTA RIZAL - MAY 29, 2018 TO SEPTEMBER 25, 2018
• CONCRETING OF ROAD INCLUDING DRAINAGE REHABILITATION,BLOOMMING HILLS SUBDIVISION,BRGY.DOLORES,TAYTAY RIZAL - FEBRUARY 6,2018 TO AUGUST 5, 2018
• REHABILITATION OF ROAD INCLUDIN G DRAINAGE SYSTEM CARABE ST.,BRGY. SAN ISIDRO,ANGONO RIZAL -MARCH 5, 2018 TO JULY 2, 2018
• REBLOCKING OF ROAD ALONG E. RODRIGUEZ PAROLA ST. BRGY. SAN ANDRES,CAINTA RIZAL - FEBRUARY 20, 2018 TO MAY 20, 2018
• CONSTRUCTION OF BRIDGE BRGY.POB IBABA AND BRGY.SAN VICENTE,ANGONO RIZAL - JULY 30, 2018 TO DECEMBER 27, 2018
• CONSTRUCTION WATER SYSTEM LEVEL II BRGY.SAN CARLOS,BINANGONAN RIZAL - FEBRUARY 6, 2018 TO JULY 5, 2018
• REHABILITATION OF WATER SYSTEM CALUMPANG SYSTEM,CALUMPANG PURPOSE COOPERATIVE BRGY.CALUMPANG,BINANGONAN RIZAL - FEBRUARY 21,2018 TO JULY 20,2018
2017 Projects
VARIOUS INFRASTRUCTURE LOCAL PROGRAM CY – 2017
-
• REPAIR OF CAINTA ELEMENTARY SCHOOL,SAN ROQUE,CAINTA RIZAL - JUNE 27, 2017 TO AUGUST 25, 2017
• REPAIR OF DARANGAN ELEMENTARY SCHOOL,KALAWAAN,BINANGONAN RIZAL - MAY 16, 2017 TO AUGUST 25, 2017
• CONSTRUCTION AND REPAIR OF URS BINANGONAN/AUDIO VISUAL CENTER,CALUMPANG,BINANGONAN RIZAL - JULY 14, 2017 TO
• IMPROVEMENT AND REHABILITATION OF FELIX FRANCISCO MEMORIAL NATIONAL HIGH SCHOOL,CAINTA RIZAL - APRIL 10, 2017 TO JUNE 8, 2017
• CONSTRUCTION OF SENIOR CITIZEN'S HALL AT KATARUNGAN VILLAGE,BRGY,SAN ISIDRO,CAINTA RIZAL
• REPAIR AND REHABILITATION OF THE COVERED COURT AT ST.GREGORY VILLAGE,SANN ISIDRO,CAINTA RIZAL
• REHABILITATION OF EXISTING DRAINAGE SYSTEM AT CEREBI SUBDIVISION,SAN ISIDRO,ANGONO RIZAL - MAY 16, 2017 TO SEPTEMBER 12, 2017
• CONST./REHAB.OF DRAINAGE SYSTEM ALONG L. WOOD,SAN ISIDRO,TAYTAY,RIZAL - MAY 15, 2017 TO AUGUST 22, 2017
• CONST.OF DOUBLE BOX CULVERT AT TAYTAY RIVER DIVERSION,TAYTAY,RIZAL - MARCH 26, 2017 TO JUNE 8, 2017
• FLOOD MITIGATION PROJECT ALONG KAGITINGAN ROAD, KARANGALAN VILLAGE, CAINTA RIZAL - JUNE 27, 2017 TO OCTOBER 24, 2017
• FLOOD MITIGATION PROJECT ALONG A. BONIFACIO DRIVER,CAINTA RIZAL - MARCH 26, 2017 TO JULY 23, 2017
• REPAIR/REHAB. OF AREA 2 EMBANKMENT, AND THE COLLAPSED PORTION ALONG THE RESIDENTIAL AREAS IN GREENWOODS VILLAGE,CAINTA RIZAL - APRIL 10, 2017 TO AUGUST 7, 2017
• CONSTRUCTION OF DRAINAGE CANAL FROM MALAYSIA ST. TO MANGGAHAN CHANNEL,RIZAL - MAY 25, 2017 TO JULY 23, 2017
• CONSTRUCTION OF DRAINAGE CANAL ALONG FLOODWAY ROAD,WESTBANK,RIZAL - MAY 25, 2017 TO AUGUST 25, 2017
• CONSTRUCTION DRAONAGE CANAL AT HIGHWAY 2000 PHASE 2(FROM GALAXY GAS STATION TO STEEL BRIDGE),RIZAL - MARCH 24, 2017 TO JUNE 23, 2017
• CONC. OF DUGAY ROAD EXTENSION AT SITIO MAMBALON,MAHABANG PARANG,BINANGONAN RIZAL - MAY 25, 2017 TO AUGUST 22, 2017
• CONST.OF COL .GUIDO STREET,SAN ROQUE, ANGONO,RIZAL - JUNE 27,2017 TO AUGUST 27, 2017
• CONST. OF EDEN VILLE ROAD,KALAYAAN/SAN ISIDRO ANGONO,RIZAL - APRIL 5, 2017 TO AUGUST 2, 2017
• REHAB.AND IMPRVT. OF ROAD WITH DRAINAGE SYSTEM,MAHABANG PARANG ANGONO - APRIL 10, 2017 TO AUGUST 7, 2017
• CONSTRUCTION/REHABILITATION(PORTION)OF COL.GUIDO STREET,ANGONO&BINANGONAN RIZAL
• CONSTRUCTION OF ONE WATER SYSTEM,BRGY,BOMBONG,BINANGONAN RIZAL - MAY 11, 2017 TO NOVEMBER 6, 2017
• CONSTRUCTION OF MULTI-PURPOSE BUILDING(BAHAY PAGASA FOR THE JUVENVILE YOUTH ST.ANTONY SUBDIVISION,BARANGAY SAN ISIDRO TAYTAY,RIZAL) - JULY 14, 2017 TO AUGUST 13, 2017
• CONSTRUCTION OF DRAINAGE SYSTEM@SO.VICTORIA TO CAINTA RIVER,BRGY SAN JUAN,CAINTA RIZAL
• CONSTRUCTION OF DRAINAGE SYSTEM(J.TOLENTINO TO S.VICTORIA)SAN JUAN,CAINTA RIZAL
• REHABILITATION AND IMPROVEMENT OF DRAINAGE SYSTEM- ISAGANI ST. MA.CLARA ST. NAVAL ST.TAYTAY,RIZAL - MAY 16, 2017 TO OCTOBER 12, 2017
• CONSTRUCTION OF SLOPE PROTECTION ALONG SAN FRANCISCO ELEMENTARY SCHOOL,BRGY.MUZON,TAYTAY RIZAL - MARCH 26, 2017 TO JUNE 8, 2017
2016 Projects
VARIOUS INFRASTRUCTURE LOCAL PROGRAM CY – 2016
-
• REPAIR/REHABILITATION OF PROTOTYPE BUILDING STA. ANA ES, TAYTAY - FEBRUARY 29, 2016 TO APRIL 28, 2016
• REPAIR/REHABILITION OF FELIX HIGHSCHOOL BRGY. STO. DOMINGO CAINTA, RIZAL - MARCH 23, 2016 TO MAY 28, 2016
• REHABILITATION OF MULTI-PURPOSE COVERED COURT PHASE II SAN ISIDRO ANGONO, RIZAL - MARCH 23, 2016 TO SEPTEMBER 18, 2016
• CONSTRUCTION OF MULTI-PURPOSE BUILDING KALAYAAN ANGONO, RIZAL - FEBRUARY 29, 2016 TO APRIL 28, 2016
• COMPLETION OF EXODUS E/S CAINTA ,RIZAL REPAIR/REHAB. OF FELIX HIGHSCHOOL BRGY. STO DOMINGO CAINTA, RIZAL - N/A
• REHABILITATION OF MULTI-PURPOSE BUILDING AT LAKESIDE PARK BRGY. SAN VICENTE ANGONO, RIZAL - MARCH 11, 2016 TO JUNE 8, 2016
• CONSTRUCTION OF MULTI PURPOSE BUILDING BRGY. TAYUMAN BINANGONAN, RIZAL -MARCH 23, 2016 TO MAY 21, 2016
• CONCRETING OF ROADS REHABILITATION OF ROAD WITH DRAINAGE SYSTEM GULOD BINANGONAN, RIZAL -MARCH 23, 2016 TO MAY 21, 2016
• CONCRETING OF ROADS WITH DRAINAGE SYSTEM REHABILITATION OF ROAD PHASE II STO. NINO BILIBIRAN BINANGONAN, RIZAL - MARCH 23, 2016 TO APRIL 25, 2016
• CONCRETING OF ROADS WITH DRAINAGE SYSTEM CAINTA, RIZAL - MARCH 23, 2016 TO MAY 21, 2016
• CONSTRUCTION /REHABILITATION OF ROAD LOCATED AT VENUS COMPOUND TO BAYTOWN HOMES BRGY. KALAYAAN ANGONO,RIZAL - MARCH 11, 2016 TO SEPTEMBER 8, 2016
• CONSTRUCTION/REHABILITATION OF ROAD BRGY. RAYAP BINANGONAN RIZAL - MARCH 18, 2016 TO JULY 15, 2016
• SLOPE PROTECTION IMPROVEMENT OF CREEK SAN LORENZO RUIZ NEIGHBORHOOD ASSOCIATION INC. BRGY. SAN ISIDRO ANGONO, RIZAL - FEBRUARY 29, 2016 TO MAY 28, 2016
• REHAB. OF BILIBIRAN CREEK, BRGY. BILIBIRAN BINANGONAN, RIZAL - MARCH 24, 2016 TO MAY 22, 2016
2015 Projects
VARIOUS INFRASTRUCTURE LOCAL PROGRAM CY – 2015
-
• CONSTRUCTION OF DRAINAGE SYSTEM, VILLAGE EAST CAINTA, RIZAL - AUGUST 11, 2015 TO MARCH 8, 2016
• CONSTRUCTION/REHABILITATION OF ROAD VENUS COMPOUND BRGY. SAN ISIDRO ANGONO, RIZAL - FEBRUARY 24, 2015 TO AUGUST 24, 2015
• REPAIR AND REHABILITATION OF LOCAL ROADS CAINTA, RIZAL - JULY 30, 2015 TO NOVEMBER 17, 2015
• CONSTRUCTION/REHABILITATION OF ROAD CAMIA ST.BRGY. BATINGAN BINANGONAN, RIZAL - APRIL 30, 2015 TO AUGUST 28, 2015
• CONSTRUCTION/REHABILITATION OF ROAD MACAPAGAL ST. BRGY. KALAYAAN ANGONO, RIZAL - FEBRUARY 24, 2015 TO AUGUST 24, 2015
• REPAIR/REHABILITATION OF LOCAL ROAD BINANGONA, RIZAL - JULY 6, 2015 TO FEBRUARY 3, 2016
• CONSTRUCTION/REHABILITATION OF ROAD BLOOMING HILLS SUBDIVISION BRGY. DOLORES TAYTAY, RIZAL -JANUARY 30, 2015 TO MAY 15, 2015
• CONSTRUCTION OF ROAD MACAMOT BINANGONAN, RIZAL F. CEQUENA EXT. - MARCH 30, 2015 AUGUST 15, 2015
• CONSTRUCTION OF ROAD BRGY. TAGPOS BINANGONAN RIZAL NETWORK ROAD STREET ANTHONY SUBDIVISION - MAY 6, 2015 TO SEPTEMBER 3, 2015
• CONSTRUCTION OF ROAD BRGY. KALINAWAN BINANGONAN, RIZAL - APRIL 6, 2015 TO AUGUST 4, 2015
• CONSTRUCTION OF ROAD BRGY. BILIBIRAN BINANGONAN, RIZAL STO. NINO - MARCH 30, 2015 AUGUST 28, 2015
• REHABILITATION OF MULTI-PURPOSE COVERED COURT BRGY. SAN ISIDRO ANGONO, RIZAL - JULY 1, 2015 TO MARCH 1, 2016
• CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. ITHAN BINANGONAN, RIZAL - JULY 2, 2015 TO OCTOBER 25, 2015
• CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. LUNSAD BINANGONAN, RIZAL - MAY 6, 2015 TO JULY 4, 2015
• CONSTRUCTION OF WATER SYSTEM SITIO HULO BRGY. PILAPILA BINANGONAN, RIZAL - JANUARY 20, 2015 TO OCTOBER 24, 2015
• CONSTRUCTION OF WATER SYSTEM CALUMPANG BINANGONAN, RIZAL -FEBRUARY 24, TO SEPTEMBER 15, 2015
• CONSTRUCTION OF WATER SYSTEM BRGY. KINAGATAN BINANGONAN, RIZAL - JANUARY 20, 2015 TO AUGUST 28, 2015
2014 Projects
VARIOUS INFRASTRUCTURE LOCAL PROGRAM CY – 2014
-
• CONSTRUCTION OF ROAD LEONCIO OJEDA ST. AND CATTLEYA ST. BRGY. MAMBOG BINANGONAN, RIZAL -JULY 17, 2014 TO NOVEMBER 10, 2014
• CONSTRUCTION OF ROAD DUGAY ST. BRGY. MAHABANG PARANG BINANGONAN, RIZAL - JULY 17, 2014 TO NOVEMBER 14, 2014
• REHABILITATION OF SCHOOL BUILDINGS, TWO DUILDINGS; RODRIGUEZ I, TWO STOREY BUILDING, 10 ROOM AND RODRIGUEZ II, THREE STOREY 21 ROOM BUILDING TAYTAY ELEMENTARY SCHOOL BRGY. DOLORES, TAYTAY, RIZAL - AUGUST 29, 2014 TO DECEMBER 27, 2014
• CONSTRUCTION OF MULTI-PURPOSE BUILDING BOTONG FRANCISCO BRGY. MAHABANG PARANG ANGONO, RIZAL - SEPTEMBER 25, 2014 TO FEBRUARY 15, 2015
• CONSTRUCTION OF 2 STOREY MULTI-PURPOSE BUILDING KABISIG ELEMENTARY SCHOOL BRGY. SAN ANDRES CAINTA, RIZAL - NOVEMBER 6, 2014 TO FEBRUARY 15, 2015
• CONSCTRICTION/REHABILITATION OF MULTI-PURPOSE BUILDING BRGY. DOLORES TAYTAY, RIZAL - NOVEMBER 6, 2014 TO FEBRUARY 15, 2015
• CONSTRUCTION OF WATER SYSTEM LEVEL 2 BARANGAY JANOSA BINANGONAN, RIZAL JANOSA NATIONAL HIGHSCHOOL - JULY 16, 2014 TO JANUARY 12, 2015
• CONSTRUCTION OF WATER SYSTEM LEVEL 2 TATALA BINANGONAN, RIZAL SITIO ASECTOLAS - AUGUST 15, 2014 TO DECEMBER 5, 2014
• WATER SUPPLY SYSTEM BRGY. TATALA, BINANGONAN, RIZAL - JULY 16, 2014 TO DECEMBER 12, 2014
2013 Projects
VARIOUS INFRASTRUCTURE LOCAL PROGRAM CY – 2013
-
• REHAB./IMPRVT.OF DRAINAGE CANAL, SITIO FELIX,SAN ANDRES(POB).CAINTA - APRIL 3,2013 TO MAY 2,2013
• REHABILITATION/RENOVATION/IMPROVEMENT OF MULTI-PURPOSE BUILDING,FEDERATION OF BINANGONAN COOP MPC BLDG, CALUMPANG,BINANGONAN - JANUARY 14,2013 TO FEBRUARY 6,2013
• IMPROVEMENT/RIPRAPPING FLOOD CONTROL,COGEO VILLAGE,BAGONG NAYON,ANTIPOLO CITY - FEBRUARY 5,2013 TO FEBRUARY 21,2013
• IMPROVEMENT/RIPRAPPING FLOOD CONTROL,SO LABANGAN,MAMBUGAN,ANTIPOLO CITY -FEBRUARY 5,2013 TO FEBRUARY 21,2013
• IMPROVEMENT/RIPRAPPING/DREDGING OF CREEK,GUPIING CREEK,LUNSAD,BINANGONAN - APRIL 3,2013 TO JULY 7,2013
• IMPROVEMENT/RIPRAPPING/DREDGING OF CREEK,GUPIING CREEK,KINAGATAN,BINANGONAN - FEBRUARY 5,2013 TO JUNE 5,2013
• IMPROVEMENT/RIPRAPPING/DREDGING OF CREEK,GUPIING CREEK,SO.WAWA,TAGPOS,BINANGONAN - APRIL 3,2013 TO JULY 17,2013
• IMPVT/REP/REHAB.OF DRAINAGE SYSTEM,J.P RIZALBATINGAN,BINANGONAN -FEBRUARY 5,2013 TO APRIL 5,2013
• CONST./IMPVT OF DRAINAGE SYSTEM SAN ROQUE,CAINTA - FEBRUARY 5,2013 TO MAY 22,2013
• SAMPAGUITA ST.&KAMIA ST. GULOD,BINANGONAN - FEBRUARY 5,2013 TO APRIL 26,2013
• REHAB.&REBLOCKING OF ROAD,ARVEEMAR HOMES,SAN ISIDRO,ANGONO - FEBRUARY 5,2013 TO MAY 22,2013
• CONST./IMPVT OF MULTI-PURPOSE PAVT.(PATHWAY)AND CANAL,MAIN ROAD,BLOCK 20&26,STO.NINO,BILIBIRAN,BIINANGONAN - FEBRUARY 5,2013 TO MAY 22,2013
• CONCRETING OF ROADS,PUROK 1&2,HABAGATAN,BINANGONAN - FEBRUARY 5,2013 TO APRIL 26,2013
• RIPRAPPING AND DREDGING PUROK 3 RAYAP, BINANGONAN - APRIL 3, 2013 TO JULY 19, 2013
• IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURE RIVERSIDE 1 TO KASINAY/TOP 40, DARANGAN, BINANGONAN - APRIL 3, 2013 TO JUNE 15, 2013
• IMPROVEMENT /RIPRAPPING/DREDGING OF GUPIING CREEK LUNSAD, BINANGONAN - APRIL 2, 2013 TO DECEMBER 17, 2013
• REPAIR OF LAGUNDI CREEK, PARAJA CREEK AND DE LEON CREEK MUZON, TAYTAY - APRIL 3, 2013 TODECEMBER 21, 2013
• CONCRETING OF ROADS,PUROK 1&2,HABAGATAN,BINANGONAN - APRIL 2, 2013 TO JULY 17, 2013
2012 Projects
VARIOUS INFRASTRUCTURE LOCAL PROGRAM CY – 2012
-
• RIPRAPPING/DESILTING OF LAZO RIVER,LIBIS, BINANGONAN, RIZAL - MARCH 15, 2012 TO MAY 13, 2012
• IMPROVEMENT OF DRAINAGE SYSTEM ALONG J.P RIZAL ST. BATINGAN, BINANGO - MARCH 8, 2012 TO MAY 6, 2012
• IMPROVEMENT OF BARANGAY MULTI-PURPOSE BUILDING SAN ANDRES CAINTA, RIZAL - MARCH 29, 2012 TO JULY 20, 2012
• IMPROVEMENT OF DOLORES CREEK BRGY. DOLORES TAYTAY, RIZAL - MARCH 15, 2012 TO JUNE 12, 2012
• REHABILITAION AND REBLOCKING OF ROAD ARVEEMAR HOMES SAN ISIDRO ANGONO - MARCH 8, 2012 TO MAY 6, 2012
• IMPROVEMENT OF BARANGAY MULTI-PURPOSE BUILDING SAN ANDRES CAINTA, RIZAL - MARCH 29, 2012 TO JULY 20, 2012
• CONSTRUCTION OF MULTI-PURPOSE BUILDING SAN JUAN TAYTAY, RIZAL - APRIL 19, 2012 TO AUGUST 16, 2012
• CONSTRUCTION OF MULTI-PURPOSE BUILDING SAN JUAN TAYTAY, RIZAL - JULY 9, 2012 TO SEPTEMBER 6, 2012
• CONSTRUCTION OF RIVER DIKE,POBLACION IBABA,ANGONO - JANUARY 26,2012 TO MARCH 16, 2012
• IMPROVEMENT OF DRAINAGE SYSTEM J.P.RIZAL,BATINGAN,BINANGONAN - DECEMBER 12,2012 TO APRIL 12,2013
• RIPRAPPING/DESILTING OF LAZO RIVER,LIBIS, BINANGONAN(COMPLETION) - DECEMBER 12, TO MAY 20,2013
• RIPRAPPING/DESILTING OF CREEK,SITIO WAWA,TAGPOS,BINANGONAN - DECEMBER 12,2012 TO APRIL 10,2013
• RIPRAPPING/DESILTING OF CREEK,LAGUNDI CREEK,MUZON,TAYTAY - DECEMBER 12,2012 TO APRIL 10,2013
• REHABILITATION OF WATER SYSTEM,SITIO BALATIK,TATALA,BINANGONAN - AUGUST 29,2012 TO SEPTEMBER 27,2012
• REHABILITATION AND REBLOCKING OF ROAD,ARVEEMAR HOMES,SAN ISIDRO,ANGONO - AUGUST 29,2012 TO SEPTEMBER 29,2012
2011 Projects
VARIOUS INFRASTRUCTURE LOCAL PROGRAM CY – 2011
-
• CONCRETING/IMPROVEMENT OF DRAINAGE SYSTEM,MARLU MONTEVISTA, BRGY.STO. NINO, CAINTA - FEBRUARY 14, 2011 TO MAY 14, 2011
• REHABILITATION OF DRAINAGE, IRMA AND GARCIA STREETS, BRGY. STO. DOMINGO, CAINTA - FEBRUARY 14, 2011 TO JUNE 3, 2011
• REPAIR/REHABILITATION OF HAKBANGAN CREEK IN BRGY.SAN ISIDRO, CAINTA,RIZAL -NOVEMBER 11, 2011 TO FEB 19, 2012
• REHABILITATION OF 8TH AND 9TH STREETS, SAN MARTIN BRGY. SAN ISIDRO ANGONO - FEBRUARY 14,2011 TO APRIL 15, 2011
• REHABILITATION/IMPROVEMENT OF ROAD, ILOG PUGAD, BRGY.SAN JUAN, TAYTAY - FEBRUARY 14, 2011 TO APRIL 15, 2011
• CONCRETING OF NAVAL STREET AND CABRERA ROAD, BRGY.SAN JUAN, TAYTAY - FEBRUARY 14, 2011 TO MAY 15, 2011
• IMPROVEMENT OF CARLOS BOTONG V. FRANCISCO MEMORIAL NATIONAL HIGH SCHOOL, MAHABANG PARANG ANGONO - FEBRUARY 7, 2011 TO APRIL 7, 2011
• CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY.SAN JUAN, TAYTAY -MARCH 4, 2011 TO JULY 1, 2011
• CONSTRUCTION/REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS CENTER) BINANGONAN, RIZAL - APRIL 11, 2011 TO JUNE 9, 2011
• CONSTRUCTION/REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS CENTER) CAINTA, RIZAL - APRIL 11, 2011 TO JUNE 9, 2011
• CONSTRUCTION OF RETAINING WALL,ANGONO RIVER, ANGONO - OCTOBER 3,2011 TO DECEMBER 21 2011
• REPAIR/REHABILITATION OF FARM-TO-MARKET ROAD,SITIO SILIHAN MAHABANG PARANG ANGONO - OCTOBER 3,2011 TO JANUARY 15,2012
• CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY.SAN JUAN, TAYTAY --2013-- OCTOBER 27,2011 TO MARCH 27,2012